Connecting Rod Reconditioning

Connecting Rods
Connecting Rods

RA Power Solutions undertakes reconditioning of connecting rods irrespective of its size and load factor. We have special purpose equipments for inspection of connecting rods and repairs. Following steps are taken for reconditioning of connecting rods.

I) Connecting rods are dis-assembled and cleaned with the special chemical.

II) Dimensional inspection of large end and small end bore is done.

III) Connecting rod is also checked for any loss of alignment on special purpose boring machine loaded with DRDO.

IV) Dye penetrant test and MPI are done for crack detection. Special attention is given to detect the crack on serration area, connecting rod bolts and bolt sitting area.

V) Machining and grinding is done to the restore the original dimension of big end and small end of connecting rods.

Connecting Rod Reconditioning
Connecting Rod Reconditioning
Reconditioning of Connecting Rod
Reconditioning of Connecting Rod

Connecting rods are inspected by senior technician and reports are maintained.

RA Power Solutions has successfully undertaken repair of more than 15,000 connecting rods in last 36 years of operation. RA Power Solutions also exports reconditioned connecting rods on low price with guarantee.

Connecting Rod Assembled with Piston After Repair
Connecting Rod Assembled with Piston After Repair
Connecting Rod of Crepelle
Connecting Rod of Crepelle